Just a few images from my old layout, The layout was constructed over 30 years ago.
This layout has been removed from the loft and re-built, see below.


_________________________________________________________________________________

Below is the new railway layout started around November 2010 with the building of the baseboard, then taking up the old
layout above and rebuilding onto the new board. The new board that now hangs from the living room ceiling and can be
lowered up and down, it was made with aluminium tubing and thin plywood and hangs with wire rope, and a winch system,
the four cables are joined into one larger cable that goes to the winch, so you get a even lift. The board is 9ft x 6ft.
The layout is finished, but really never is.














May 2016 below.